Home/Projects/Manufacturing and Assembly of Switchgear Equipment

Manufacturing and Assembly of Switchgear Equipment

Manufacturing of switchgear equipment: panel assembly, KSO/KRU (switchgear cabinets), LV switchgear (low-voltage switchgear assemblies) in our workshop

Manufacturing and Assembly of Switchgear Equipment

In-house manufacturing: panel assembly, KSO/KRU (switchgear cabinets) and LV switchgear (low-voltage switchgear assemblies) in our workshop, plus commissioning.

Switchgear equipment is assembled at our own production facility: metal enclosures, busbar work, installation of devices and secondary circuits, quality control and commissioning. Below is the manufacturing process.

Site photos

Manufacturing and Assembly of Switchgear Equipment — photo 1
Manufacturing and Assembly of Switchgear Equipment — photo 2
Manufacturing and Assembly of Switchgear Equipment — photo 3
Manufacturing and Assembly of Switchgear Equipment — photo 4
Manufacturing and Assembly of Switchgear Equipment — photo 5
Manufacturing and Assembly of Switchgear Equipment — photo 6
В
В'ячеслав Юрдик
Інженер з якості
Понад 1000 одиниць обладнання прийнято на виробництві (ОТК) та 200 об’єктів електромонтажу під технічним наглядом.

Need a similar project?
We’ll estimate yours

Send us your specification or describe the task — we will propose a solution and estimate the time and cost. Preliminary reply within 24 hours.

+380 67 104 94 91
Discuss the project

Send your single-line diagram or specification to info@lk-energy.com.ua — or we will contact you and ask.